Tenders

TRENTHAM SCHOOL – BLOCK A MODERNISATION CLASSROOM ILE & RE-ROOFING WORK

Moonshine Road, Upper Hutt

TENDERS MUST BE SUBMITTED BEFORE 4:00PM

Re-ROOFING to BLOCK A:
Extend main Block A skillion roof over Classrooms 1-6 and reclad.
Demolish & rebuild secondary
BLOCK A: 
membrane roof & clad with profiled metal.
New clerestory windows & wall cladding.
New connections to SW lateral.
Internal modifications to Block A:
New/ removed interior walls for new layout, new bracing (wall linings), openings,
wall and floor finishes & new plumbing fixtures.
New engineered beams and lintels, braced frames and footings.
New fire alarm, electrical DB.
Block R:
Removing existing skylights and re-roofing over.
Block C:
Replacing existing clear roofing to verandah including safety mesh.

MOE MAJOR WORKS (COMBINED) – BOULCOTT SCHOOL & HUTT VALLEY HIGH SCHOOL

Tenders must be submitted by 4.00pm

NOTICE TO TENDERERS: NTT No. 1 –  (issued to 17/02/20)

Pricing:- MOE have combined both projects but separate pricing is required and essential when submitting your Tender.

The works required at Boulcott School are:
i. Construction services for a weathertightness remediation project at Boulcott School
ii. Includes cladding, framing timbers, roofing, flashings
iii. The main works will include but not limited to internal repair work
iv. The works are to be delivered in a single stage
v. There are no requirements for phasing and/or staging
vi. There are no known constraints, limitations or special requirements for the project.

The works required at Hutt Valley High School are:
i. Construction services for a weathertightness remediation project at Hutt Valley High School
ii. Work includes: – A roof restructure, exterior reclad, internal refurbishment
iii. The Tech Block W was recently damaged by a fire and remediation is needed
iv. The works are to be delivered in a single stage
v. There are no requirements for phasing and/or staging
vi. There are no known constraints, limitations or special requirements for the project.

OUR LADY OF THE ROSARY SCHOOL – NEW CLASSROOMS

12-16 Wainui Road, Lower Hutt

Tenders must be submitted by 4pm.

Description of the work:
Demolition of the existing timber framed classrooms, Block B.  Construction of new single storey classroom block (two classrooms) with 2 unisex toilets & 1 accessible toilet, cloaks (inside & outside), forming a new hall kitchen & associated site works & services.

NOTICE TO TENDERERSNo. 1: –  3  (Issued 17/02/20)

 

310 ORIENTAL PARADE – Facade Recladding and Seismic Upgrades

310 Oriental Parade, Wellington

TENDERS must be submitted by 4:00PM
NTT 1-16 uploaded

PLEASE NOTE: The following trades have a Schedule of Quantities as prepared by Rider Levett & Bucknall provided in the tender documentation to assist with pricing.

A fully priced schedule will be required to be provided to PCWL if we are successful with this Tender.  

  • Concrete work
  • Reinforcing Steel
  • Carpentry
  • Roofing
  • Tiling & Paving
  • Resene Construction Systems
  • Plasterboard Linings
  • Painting & Specialised Finishes

DESCRIPTION OF THE WORK –
2112 PARTIAL DEMOLITION for detail of demolition works
– Install new Rockcote cladding systems incl new wall underlay system
– Construct new concrete walls & sills for West facade Sun-rooms and deck
– Supply & install new glass balustrade systems for west facing decks
– Fabricate & install new joinery units to West facade except Levels 1 & 2 incl tinted glass
– Fabricate & install new joinery units to East staircase tower including tinted glass
– Upgrade existing fire systems including the replacement of existing doors & walls to achieve required fire rating,
– Connect new fire alarms
– Replace decayed timber framing discovered while recladding
– make additional deck drain outlets & sw drains
– make good to lining, services affected by re-cladding and seismic strengthening works.
– Seismic upgrade existing structures in carpark levels, Entrances & east columns in APTS 2, 4 & 6
– Repair rusted steel underside of Hi-Bond slab and provide protective paint finish
– Provide new paint finish to new construction structures, cladding system & repaint existing painted surfaces
– Install new metal roof parapet wall capping, skylight above staircase